Opening or changing an X-ray facility in Minnesota can feel confusing. This guide puts the state-level steps, forms, filing links, fees, and contacts in one place.
Get shielding help in Minnesota
Planning an X-ray project in Minnesota? Most rooms need a shielding design before registration. Send the floor plan — quotes come back within one business day.
Request a Shielding DesignHeartland Physics can review the project scope and confirm whether its current qualifications and authorization cover any shielding work required for this project. Use the current government sources linked below for registration, plan review, fees, inspections, and filing requirements.
Quick answer
A brand-new Minnesota facility or new owner mails the Initial Registration Form and payment before first use. After payment, the state sends an invitation to finish the equipment record in the online X-ray Registration System.
Start here: official forms and filing links
Each blue button opens the exact official form, portal, or state instruction page in a new tab.
What to gather before you start
• Facility, owner, administrator, and contact information
• Federal and Minnesota tax IDs
• Equipment types and machine details
• Shielding documentation for the room
• Current Equipment Performance Evaluation records
Step-by-step instructions
Step 1: Complete shielding and equipment checks
Keep the room shielding documentation. Have a Minnesota-registered service provider complete required calibration and performance work before first use.
Step 2: Complete the Initial Registration Form
Use this form only for a new facility, a new owner, or an unregistered satellite location. List the facility and all initial equipment.
Step 3: Mail the form and payment
Mail the application and required payment to Minnesota Department of Health, Radiation Control X-ray Unit, P.O. Box 64497, St. Paul, MN 55164-0497. The annual base fee is $155; equipment fees are added by machine type.
Step 4: Accept the portal invitation
After the payment is received, Minnesota emails an invitation. Sign in and complete every required facility and machine field before first use.
Step 5: Use the portal for changes and annual renewal
Add later equipment in the online system within 30 days and before first use. Pay annual invoices online and download the current certificate.
Cost
The annual facility base fee is $155. Equipment fees are added by type; for example, dental X-ray equipment is $60 per unit under the current guide.
State contact
Minnesota Department of Health X-ray Unit: health.xray@state.mn.us.
Keep these records together
• Submitted application and payment receipt
• Current registration certificate or license
• Shielding design, calculations, and state review letter when applicable
• Installer paperwork, FDA Form 2579 when applicable, acceptance tests, and equipment-performance reports
• Operating procedures, staff training, dosimetry, maintenance, and inspection records that apply to the facility
Important reminder
This guide covers the usual state-level radiation-machine process. Mammography, radiation therapy, mobile use, healing-arts screening, and some industrial systems can have extra approvals. Complete those extra steps when they apply to your equipment.
Official sources
Use the current government sources linked on this page. Requirements, forms, fees, contacts, and procedures can change.
Get shielding help in Minnesota
Planning an X-ray project in Minnesota? Most rooms need a shielding design before registration. Send the floor plan — quotes come back within one business day.
Request a Shielding DesignLast updated Aug 21
Next step
Need a shielding design for your project?
Send the basics through the structured request form — we respond within one business day.
