Opening or changing an X-ray facility in Missouri can feel confusing. This guide puts the state-level steps, forms, filing links, fees, and contacts in one place.
Get shielding help in Missouri
Planning an X-ray project in Missouri? Most rooms need a shielding design before registration. Send the floor plan — quotes come back within one business day.
Request a Shielding DesignHeartland Physics can review the project scope and confirm whether its current qualifications and authorization cover any shielding work required for this project. Use the current government sources linked below for registration, plan review, fees, inspections, and filing requirements.
Quick answer
Missouri facilities register diagnostic X-ray machines with the Missouri Radiation Control Program. Complete the medical radiation registration form, list every machine, and send the signed form to the program.
Start here: official forms and filing links
Each blue button opens the exact official form, portal, or state instruction page in a new tab.
What to gather before you start
• Facility, owner, and contact information
• Radiation-safety contact
• Machine manufacturer, model, serial number, type, tube count, and room
• Shielding design and calculation report
• Installer and equipment-performance records
Step-by-step instructions
Step 1: Plan the shielding
New and relocated Missouri X-ray facilities need a shielding evaluation by a Missouri-approved Qualified Expert. New facilities also need the applicable Qualified Expert radiation-safety survey. Timing depends on the equipment class: CT, fluoroscopy/C-arm, radiation therapy, and mammography must be surveyed before routine clinical use; newly installed dental CBCT must be evaluated and inspected within 30 days; most other new Class B, C, and D equipment must have the required onsite survey within 90 days of beginning use.
Step 2: Complete the registration form
Enter the facility and owner information. List each machine in the inventory section. The form has room for up to 15 machines.
Step 3: Sign and submit
Email the signed form to MRCP@health.mo.gov. You may also mail it to Missouri Radiation Control Program, P.O. Box 570, Jefferson City, MO 65102-0570.
Step 4: Keep the registration file
Save the submitted form, shielding report, installation paperwork, performance tests, and state response.
Step 5: Report later changes
Notify the program when ownership, address, contacts, or equipment change. Follow the state's renewal or update notice when received.
Cost
Follow the current fee or invoice instructions from the Missouri Radiation Control Program. The amount depends on the registered equipment.
State contact
Missouri Radiation Control Program: MRCP@health.mo.gov.
Keep these records together
• Submitted application and payment receipt
• Current registration certificate or license
• Shielding design, calculations, and state review letter when applicable
• Installer paperwork, FDA Form 2579 when applicable, acceptance tests, and equipment-performance reports
• Operating procedures, staff training, dosimetry, maintenance, and inspection records that apply to the facility
Important reminder
This guide covers the usual state-level radiation-machine process. Mammography, radiation therapy, mobile use, healing-arts screening, and some industrial systems can have extra approvals. Complete those extra steps when they apply to your equipment.
Official sources
Use the current government sources linked on this page. Requirements, forms, fees, contacts, and procedures can change.
Get shielding help in Missouri
Planning an X-ray project in Missouri? Most rooms need a shielding design before registration. Send the floor plan — quotes come back within one business day.
Request a Shielding DesignLast updated Aug 21
Next step
Need a shielding design for your project?
Send the basics through the structured request form — we respond within one business day.
