Registration Guide

How to Register an X-Ray Machine in SouthDakota: A Simple Step-by-Step Guide

Opening or changing an X-ray facility in South Dakota can feel confusing. This guide puts the state-level steps, forms, filing links, fees, and contacts in one place.

Get shielding help in South Dakota

Planning an X-ray project in South Dakota? Most rooms need a shielding design before registration. Send the floor plan — quotes come back within one business day.

Request a Shielding Design

Heartland Physics can review the project scope and confirm whether its current qualifications and authorization cover any shielding work required for this project. Use the current government sources linked below for registration, plan review, fees, inspections, and filing requirements.

Quick answer

South Dakota treats an X-ray facility as a licensed healthcare facility. Apply through the state's healthcare licensing system. The license renews every year, and the X-ray facility must be surveyed at least every three years by a state inspector or physicist.

Start here: official forms and filing links

Each blue button opens the exact official form, portal, or state instruction page in a new tab.

What to gather before you start

• Facility legal name, address, ownership, and contacts

• Machine and room information

• Shielding design for new construction or changed rooms

• Personnel education and training records

• Film badge or dosimetry records

• Technique chart, protective-device checks, and equipment quality records

Step-by-step instructions

Step 1: Plan the room before construction

Submit plans for new X-ray construction so the shielding requirements can be reviewed. When a health physicist's shielding recommendations are used, use a provider whose current qualifications cover the work.

Step 2: Create an account in the licensing system

Open the South Dakota healthcare licensing system and choose the X-ray facility license application.

Step 3: Complete the facility application

Enter the ownership, location, contact, room, and machine information. Upload requested construction, shielding, and safety records and pay the application charge shown by the system.

Step 4: Prepare the seven inspection record groups

Keep dosimetry reports, technique charts, processor or image-quality records, patient examination records, staff training, annual protective-device evaluations, and annual CT physicist reports when applicable.

Step 5: Renew annually and complete the three-year survey

Renew the facility license each year after December 1. Arrange a state or physicist X-ray survey at least every three years and correct any findings by the deadline.

Cost

The online licensing system shows the current X-ray facility application and annual renewal fee.

State contact

South Dakota X-ray facility contacts: John Priest, john.priest@state.sd.us; Melissa Heymans, Melissa.Heymans@state.sd.us.

Keep these records together

• Submitted application and payment receipt

• Current registration certificate or license

• Shielding design, calculations, and state review letter when applicable

• Installer paperwork, FDA Form 2579 when applicable, acceptance tests, and equipment-performance reports

• Operating procedures, staff training, dosimetry, maintenance, and inspection records that apply to the facility

Important reminder

This guide covers the usual state-level radiation-machine process. Mammography, radiation therapy, mobile use, healing-arts screening, and some industrial systems can have extra approvals. Complete those extra steps when they apply to your equipment.

Official sources

Use the current government sources linked on this page. Requirements, forms, fees, contacts, and procedures can change.

3 views

Get shielding help in South Dakota

Planning an X-ray project in South Dakota? Most rooms need a shielding design before registration. Send the floor plan — quotes come back within one business day.

Request a Shielding Design

Last updated Aug 21

Next step

Need a shielding design for your project?

Send the basics through the structured request form — we respond within one business day.