X-ray shieldingrequirements in Montana.

Plain-language guidance for imaging facilities in Montana — what to file, who regulates it, and where a shielding design fits in the process.

The short answer

Montana requires a radiation machine to be registered within 30 days of possession. The state's current process is online, and registered machines are re-registered every two years.

From our Montana registration guide

The usual order of operations

01

Shielding design before construction

A qualified physicist calculates every barrier — walls, floor, ceiling, doors, and windows — for your exact equipment, layout, workload, and adjacent occupancy.

02

Register with the state

Radiation machines are registered with the state radiation-control program, usually before or as operations begin.

03

Build and install per the design

Your contractor builds to the material specifications in the shielding report — no guesswork at the job site.

04

Plan review and final checks

Where the state or local authority requires it, the report goes in for plan review; a post-installation survey closes the loop where required.

Official Montana resources

Project in Montana?

$950 per room. Report in five business days. 90-day money-back guarantee.

Requirements change and vary by project. The current rules of the responsible radiation-control authority always control — we confirm them for your project as part of every design.