Shielding requirements — North Carolina
X-ray shieldingrequirements in North Carolina.
Plain-language guidance for imaging facilities in North Carolina — what to file, who regulates it, and where a shielding design fits in the process.
The short answer
North Carolina requires a facility and each radiation machine to be registered. The rule requires registration within 30 days following initial operation, and registration fees are assessed when the registration is issued and annually on July 1.
From our North Carolina registration guide
The usual order of operations
Shielding design before construction
A qualified physicist calculates every barrier — walls, floor, ceiling, doors, and windows — for your exact equipment, layout, workload, and adjacent occupancy.
Register with the state
Radiation machines are registered with the state radiation-control program, usually before or as operations begin.
Build and install per the design
Your contractor builds to the material specifications in the shielding report — no guesswork at the job site.
Plan review and final checks
Where the state or local authority requires it, the report goes in for plan review; a post-installation survey closes the loop where required.
Official North Carolina resources
Project in North Carolina?
$950 per room. Report in five business days. 90-day money-back guarantee.
Requirements change and vary by project. The current rules of the responsible radiation-control authority always control — we confirm them for your project as part of every design.
