Shielding requirements — Texas

X-ray shieldingrequirements in Texas.

Plain-language guidance for imaging facilities in Texas — what to file, who regulates it, and where a shielding design fits in the process.

The short answer

Texas requires a Certificate of Registration before regulated radiation-machine operations begin. The current registration application is RC Form 226-2, revised in 2026, and the application package includes the machine/facility information and other business or RSO documents that apply to the facility.

From our Texas registration guide

The usual order of operations

01

Shielding design before construction

A qualified physicist calculates every barrier — walls, floor, ceiling, doors, and windows — for your exact equipment, layout, workload, and adjacent occupancy.

02

Register with the state

Radiation machines are registered with the state radiation-control program, usually before or as operations begin.

03

Build and install per the design

Your contractor builds to the material specifications in the shielding report — no guesswork at the job site.

04

Plan review and final checks

Where the state or local authority requires it, the report goes in for plan review; a post-installation survey closes the loop where required.