Shielding requirements — Pennsylvania
X-ray shieldingrequirements in Pennsylvania.
Plain-language guidance for imaging facilities in Pennsylvania — what to file, who regulates it, and where a shielding design fits in the process.
The short answer
Pennsylvania requires the facility to register each radiation-producing machine within 30 days after acquiring it. Mail the registration form and the full fee to the Department of Environmental Protection.
From our Pennsylvania registration guide
The usual order of operations
Shielding design before construction
A qualified physicist calculates every barrier — walls, floor, ceiling, doors, and windows — for your exact equipment, layout, workload, and adjacent occupancy.
Register with the state
Radiation machines are registered with the state radiation-control program, usually before or as operations begin.
Build and install per the design
Your contractor builds to the material specifications in the shielding report — no guesswork at the job site.
Plan review and final checks
Where the state or local authority requires it, the report goes in for plan review; a post-installation survey closes the loop where required.
Official Pennsylvania resources
Project in Pennsylvania?
$950 per room. Report in five business days. 90-day money-back guarantee.
Requirements change and vary by project. The current rules of the responsible radiation-control authority always control — we confirm them for your project as part of every design.